Jacka 2 Stage 1B
VALUE: $20M
YEAR: 2023-2024
DURATION: Under Construction
CLIENT: ACT Government
REFEREE: Sarju Prajapati
SUMMARY
Jacka 2 Stage 1B civil engineering and landscape construction project started in 2023. It was initiated to construct supporting infrastructure for the development of 109 suburban blocks and three multiunit blocks within Jacka, ACT.
This stage is being concurrently delivered under three separate construction contracts. Each stage takes into consideration site topography, road connections, existing service connections, water pressure zones, construction progress and other engineering constraints. It also encompasses a water supply main connection to the existing Bonner Reservoir located to the east of the site.
PROJECT FEATURES
Detailed project establishment
Environmental management plan
Street lighting
WSUD infrastructure
Disposal of surplus soils off site and controlled filling
Water, stormwater, sewer, communication and electrical utilities installation
Soft landscaping
Multiple contractors
Multiple stakeholders, including local residents
Kerbs and concrete verge pavements
Flexible road pavement
Clearing of trees and shrubs
Bulk earthworks, including excavation
Hard landscaping – decking, paving and sculptures
Construction of netball courts
Watermain reservoir connection
Weed management controls
Use of recycled materials